Search
Page 3 of 3
From experience, I can safely say "It is better to spend 10 months planning a layout and 10 weeks building it than the other way around!"
Why, well given time and discussion with other mode...
/modelling/planning-the-layout.htm
January 20th at the club house
Annual General Meeting 08:00
/events/meetings/1465.htm
I came back into this hobby about in 2005 because I needed a complete break from work in my spare time after a heart operation. My initial attraction was to run the layout using computer co...
/computer-control/
Please view these in the order they are presented for your first training session.
TrainController Course, Lesson 1: Draw Switchboard
TrainController Course, Lesson 2: Connect Switches to ...
/computer-control/traincontroller-gold-videos.htm
When using block control on your layout or when using any other type of train on track indicator, then the most popular technology to use is where the sensor looks for a small current passing through ...
/computer-control/resistor-wheel-sets.htm
We are fitting 8 of these devices to Yeovil Town which will interface with Traincontroller Gold. This will give us 64 blocks. The Lenz system fitted to Yeovil Town is dedicated to just provide t...
/computer-control/3276.htm
Traincontroller Gold Video Training section 2. Please view the videos in order;
Traincontroller Video 1:
Traincontroller Video 2:
Traincontroller Video 3:
&...
/computer-control/traincontroller-gold-videos2.htm