Signals are changing A short delay for attending the NEC over the weekend means we have bought more signals and controllers. Read More
Computers have taken over The main computer (mini Tower Dell) has been set up with Traincontroller Gold version 9 and installed at the layout. I ... Read More
Automation just about there It's been a long time coming but we have now completed the wiring for feedback modules under the layout. Read More
Lets straighten a few things out then During open day the baseboard for the goods area dipped about 5mm in the middle as it must have had some excessive weigh... Read More
Let me level with you Well it was a frantic time getting ready for the YMRG Open Day in July. Read More
Ready, Set, Go! The boards are now fixed together never to be separated and the surface sanded. Read More
It's a swivel Jim but not as we know it We have finally made some headway with the new track on the new front boards. Read More
Repairs after renewal Having stripped down the two scenic boards that have been partly completed and removed them to a shed at home… Read More
Time to dismantle but then forge ahead We are finding it very slow travelling to the clubhouse to model small areas of detail … Read More
Brown is the colour Having managed to get the second board scenic section blocked out with polystyrene … Read More
Movement at last After a long holiday period and some secondment to the "The Summit" project… Read More
Hectic Days in Yeovil With two of the team in not the best of health at present there is a lot to do for the remaining two of us… Read More
Change is signaled at Yeovil Town After much consideration as to the merits of motorising the ground signals on Yeovil Town… Read More
Dark Days in Yeovil Whilst board 2 is away from the layout gaining a scenic look! we have been gradually covering the approaches and exits t... Read More