Yeovil Town through the shed
Skip Navigation LinksHome > Blog > Yeovil Town > Movement at last

Movement at last

1517
Views

After a long holiday period and some secondment to the "The Summit" project We have finally started to make the second board scenic. Again we are using Polystyrene for the cutting sides as this is the best option for this type of slope which is stepped in real life so we need to copy that here.  We have an exact profile template for matching up with board 1 so we should maintain continuity.  I am hoping to spend far more time between club nights quietly progressing the scenic part but also completing the train detection electronics for the main front section of track.  This will be complicated as the sections can be quite small however they need to exist, along with some positive locators in the form of infra-red sensors.

Category: Yeovil Town

Rate: