Search
Page 8 of 8
After changing a TT300 point motor in the goods yard in November which appeared to male before break on the micro-switch we discovered that we have a further 3 units causing the same fault in the fidd...
/blog/yeovil-town/3362.htm
/gallery/yeovil-town-new/3347.htm
Having stripped down the two scenic boards that have been partly completed and removed them to a shed at home to complete the task we stripped off more boards from the front of the layout so that the ...
/blog/yeovil-town/3349.htm
/gallery/yeovil-town/3350.htm
We have finally made some headway with the new track on the new front boards. The boards were designed many years ago and by chance the joint between two 6ft x 2ft boards lies directly under com...
/blog/yeovil-town/3351.htm
The boards are now fixed together never to be separated and the surface sanded. New cork has been laid and sanded so all is well for the new track to be fitted.
I now need to plan the electrics...
/blog/yeovil-town/3352.htm
Well it was a frantic time getting ready for the YMRG Open Day in July. Keith managed to complete the new track-work for points to and from Yeovil Junction just in time but Olivia and I had a bu...
/blog/yeovil-town/3353.htm
During open day the baseboard for the goods area dipped about 5mm in the middle as it must have had some excessive weight on it sometime in the last year!
We are planning to remove it and add st...
/blog/yeovil-town/3354.htm
This is the first time I have been able to publish one of the automatic sequences. This is a test sequence where the dwell time at platforms has been reduced to save time. The quality of the mon...
/blog/yeovil-town/3368.htm
We have updated our TrainController videos list as more have become available. You can find the updated list at www.ymrg.co.uk/computer-control/traincontroller-gold-videos2.htm
/blog/yeovil-town/3369.htm