South Junction 0093
Skip Navigation LinksHome > Layouts > Club

Club Layouts

I've talked to members of other clubs quite often at shows and have found that the length of time it takes to produce an "Exhibition Standard" layout varies from less than six months to about six years or more.  I put the exhibition standard in quotes because some are far from it IMHO.  They are though, a reflection of the members of their club, who all have different backgrounds and skills.

The essential thing is that it was a club project because when you are involved in one of these layout projects you tend to learn more in one night than you can struggling at home on your own for months...

Yeovil Model Railway Group have balanced "having fun" at the club nights with a very high standard of exhibition layout.  There is nothing quite like the pride you feel whilst at an exhibition and running the club layout, when praise comes your way from the public.  The team aspects and camaraderie are just two of the pleasures you can get from this lovely hobby of ours.

We have a number of club layouts - why not take a look at them and see the diversity of projects.  Normally the statement from older members is "we don't do stations" because the club tends to want to build exhibition layouts that continuously run and keep the public interested.  Yeovil Town is a major deviation from that historic approach but as it is DCC and and has many features and sections of track then 3 or 4 operators can be keeping the show going somewhere or other to meet the same end target...

4mm Layouts
7mm Layouts
South JunctionSouth Junction a large EM gauge layout packed full of features and interest Gas WorksGas Works a well travelled O gauge layout which still gives a WOW factor many many years on
Yeovil JunctionYeovil Town adopted by the group this OO gauge layout will be spliced into a fiddle yard to give continuous running on club nights The SummitThe Summit a very large and dramatic O gauge layout that needs plenty of exhibition hall room
Hen Ford RunHen Ford Run is an OO gauge single continuous loop test track which normally runs on DCC but can run DC O Gauge Test TrackThe O gauge test track is a double track circular test track

2mm Layouts

 
Lower Hen FordLower Hen Ford is a  2mm N gauge twin track bare layout which can be used as a test track - currently being developed.  

 


Contact Us

Who: Ed Pickup

Tel:

07970 382288
Email: Email Us

Gas Works 42 Yeovil Town Station 19 Gas Works 11 Gas Works 35 The Summit 34 Yeovil Town Station 10 Gas Works 23 South Junction 7 Gas Works 47 Yeovil Town Station 29 Hen Ford Run 19 Gas Works 31 Albion Quarry 3 Backwater 1 Gas Works 2 Albion Quarry 5 Yeovil Town Station 2 Hen Ford Run 16 South West by Southern 5 South West by Southern 30 Backwater 8 Yeovil Town Station 9 Backwater 7 Yeovil Town Station 16 Gas Works 21 Yeovil Town Station 28 South Junction 0071 Yeovil Town through the shed South Junction 0093 South West by Southern 19 South West by Southern 7 South West by Southern 18 Yeovil Town Station 25 Yeovil Town Station 35 South West by Southern 37 Tunnel Mouth Gas Works 16 South West by Southern 15 The Summit 31 Gas Works 39 Backwater 9 Gas Works 20 South Junction 4 Yeovil Town Station 34 South Junction 0065 Gas Works 7 Yeovil Town Station 3 South West by Southern 11 South West by Southern 4 Backwater 6