South Junction 0071
Skip Navigation LinksHome > Layouts > Club

Club Layouts

I've talked to members of other clubs quite often at shows and have found that the length of time it takes to produce an "Exhibition Standard" layout varies from less than six months to about six years or more.  I put the exhibition standard in quotes because some are far from it IMHO.  They are though, a reflection of the members of their club, who all have different backgrounds and skills.

The essential thing is that it was a club project because when you are involved in one of these layout projects you tend to learn more in one night than you can struggling at home on your own for months...

Yeovil Model Railway Group have balanced "having fun" at the club nights with a very high standard of exhibition layout.  There is nothing quite like the pride you feel whilst at an exhibition and running the club layout, when praise comes your way from the public.  The team aspects and camaraderie are just two of the pleasures you can get from this lovely hobby of ours.

We have a number of club layouts - why not take a look at them and see the diversity of projects.  Normally the statement from older members is "we don't do stations" because the club tends to want to build exhibition layouts that continuously run and keep the public interested.  Yeovil Town is a major deviation from that historic approach but as it is DCC and and has many features and sections of track then 3 or 4 operators can be keeping the show going somewhere or other to meet the same end target...

4mm Layouts
7mm Layouts
South JunctionSouth Junction a large EM gauge layout packed full of features and interest Gas WorksGas Works a well travelled O gauge layout which still gives a WOW factor many many years on
Yeovil JunctionYeovil Town adopted by the group this OO gauge layout will be spliced into a fiddle yard to give continuous running on club nights The SummitThe Summit a very large and dramatic O gauge layout that needs plenty of exhibition hall room
Hen Ford RunHen Ford Run is an OO gauge single continuous loop test track which normally runs on DCC but can run DC O Gauge Test TrackThe O gauge test track is a double track circular test track

2mm Layouts

 
Lower Hen FordLower Hen Ford is a  2mm N gauge twin track bare layout which can be used as a test track - currently being developed.  

 


Contact Us

Who: Ed Pickup

Tel:

07970 382288
Email: Email Us

South Junction 0059 Hen Ford Run 2 Gas Works 1 Gas Works 10 South West by Southern 22 South West by Southern 8 Yeovil Town Station 20 Backwater 3 Yeovil Town Station 34 South Junction 0070 South Junction 0081 South West by Southern 31 Yeovil Town Station 7 Hen Ford Run 1 Gas Works 5 The Summit 28 Yeovil Town Station 29 South West by Southern 13 Backwater 9 South Junction 9 South West by Southern 32 Albion Quarry 7 South Junction 0065 South Junction 8 South West by Southern 1 Backwater 5 Yeovil Town Station 25 Hen Ford Run 8 Albion Quarry 5 Hen Ford Run 17 South West by Southern 10 Gas Works 14 Yeovil Town Station 26 Gas Works 15 South West by Southern 6 Hen Ford Run 7 Albion Quarry 4 South Junction 6 South West by Southern 17 Gas Works 47 The Summit 35 The Summit 33 Gas Works 27 O Gauge Test Track 33 Hen Ford Run 21 Backwater 8 Gas Works 45 Yeovil Town Station 18 Hen Ford Run 13 Hen Ford Run 0